Crews begin removing first pieces of collapsed Baltimore bridge
9NEWS 9NEWS
390K subscribers
102,577 views
0

 Published On Apr 1, 2024

As crews continued the complicated and meticulous operation of removing the steel and concrete from the fallen Francis Scott Key Bridge in Baltimore, some near the site took time on Easter Sunday to reflect on the six workers presumed to have plunged to their deaths.

As cranes periodically swung into place and workers measured and cut the steel to prepare to lift sections of twisted steel, Rev. Ako Walker held a Mass in Spanish at Sacred Heart of Jesus, about 5 miles up the Patapsco River from the collapse.

“Yes we can rebuild a bridge, but we have to look at the way in which migrant workers are treated and how best we can improve their situation as they come to the United States of America,” Walker said of the men who were from Mexico, Guatemala, Honduras and El Salvador and were patching potholes.

The bridge fell early Tuesday as the crew of the cargo ship Dali lost power and control. They called in a mayday, which allowed just enough time for police to stop vehicles from getting on the bridge, but not enough time to get a crew of eight workers off the structure.

Two workers survived, two bodies were found in a submerged pickup and four more men are presumed dead. Weather conditions and the tangled debris underwater have made it too dangerous for divers to search for their bodies.

show more

Share/Embed